19 November 2026 • 6 min read
ISRO runs the ISRO System for Safe and Sustainable Space Operations Management, or IS4OM. ISRO says it functions as the nodal entity for all space sustainability efforts, including Space Situational Awareness (SSA), to protect national space assets from space environmental hazards. 1
Its prime activities are regular assessment of close approach risks posed by resident space objects to satellites and launch vehicles, predicting uncontrolled atmospheric re-entries, and studying how space object populations evolve. An annual assessment is compiled as the Indian Space Situational Assessment Report (ISSAR) and shared with stakeholders. 2
ISRO's 2022 report says IS4OM was dedicated to the nation by Minister of State Dr. Jitendra Singh in 2022. It is mandated to cover observation and monitoring, orbit determination, cataloguing, threat detection, risk assessment, data exchange and collaboration. 6
Why it matters (our view)
Debris rules are moving from guidelines to design requirements for Indian satellite builders, so disposal planning belongs in the first architecture review.
Expect more coordination and fuel overhead as congestion grows; teams that plan for it early will lose less mission life.
ISRO's ISSAR-2025 was released by ISRO Chairman Dr. V. Narayanan on 8 April 2026 at the second international conference on Spacecraft Mission Operations in Bengaluru. It says 2025 saw the highest number of launches since the beginning of the space age: 328 launch attempts, of which 315 were successful. 1
A total of 4651 objects were added to the space object population in 2025. ISRO compares this with 2963 objects from 254 launches in 2024 and 3135 objects from 212 launches in 2023. A total of 1911 catalogued objects re-entered the atmosphere. No major on-orbit break-up events were reported in 2025. 1
Of the 10749 Starlink satellites, 9396 were still in orbit at the end of 2025 and 1353 had re-entered. ISRO says the roughly 1,60,000 close approach alerts indicate congestion, especially in low-Earth orbit, and that active satellites may outnumber debris within the current decade. 1
ISRO says that over 1,50,000 alerts issued by the Combined Space Operations Center of USSPACECOM for its Earth-orbiting satellites were analysed in 2025 using more accurate orbital data from operational flight dynamics. This led to 4 collision avoidance manoeuvres (CAMs) in GEO and 14 in LEO, one of them for NISAR. 1
Where feasible, ISRO met collision avoidance needs by adjusting regular orbit-maintenance manoeuvres instead of performing separate CAMs. Every manoeuvre plan is also checked for close approaches afterwards; in 2025, 82 plans for LEO satellites were revised for this reason. 1
Launches are screened too. Collision Avoidance Analysis (COLA) is part of ISRO's mandatory Launch Clearance Protocol. The LVM3-M6 lift-off in December 2025 was delayed by 41 sec on COLA's recommendation. In 2024, PSLV-C60 was delayed by 2 min 15 sec. 1,2
Across the reports, alert counts rose sharply. ISRO reported 543 USSPACECOM conjunction alerts for 2021, about 13000 such alerts for 2022, about 137565 for 2023, more than 53000 for 2024, and about 1,60,000 in the 2025 global summary. 4,6,3,2,1
CAMs for Earth-orbiting satellites were 22 in 2022 (including one lunar), 23 in 2023, 10 in 2024 and 18 in 2025. ISRO says the fall in 2024 came from improved close approach analysis with a larger screening volume and more accurate ephemerides, which allowed adjusting orbit maintenance instead. 6,3,2,1
ISRO's 2022 report warns that no universally accepted Space Traffic Management framework exists, so resolving conjunctions between operational satellites adds operational complexity. Costs of CAMs include fuel, disrupted payload operations and coordination with outside operators. 6
| Year | Alerts / counts reported | CAMs | Source |
|---|---|---|---|
| 2021 | 543 USPACECOM conjunction alerts | Not stated | 4 |
| 2022 | About 13000 USSPACECOM alerts | 22 | 6 |
| 2023 | About 137565 USSPACECOM alerts | 23 (LEO+GEO) | 3 |
| 2024 | More than 53000 CSpOC alerts | 10 (LEO+GEO) | 2 |
| 2025 | More than 1,50,000 CSpOC alerts | 18 (LEO+GEO) | 1 |
ISRO Chairman S. Somanath declared India's intent on Debris Free Space Missions (DFSM) on 16 April 2024 at the 42nd annual meeting of the Inter-Agency Space Debris Co-ordination Committee in Bengaluru. The aim is debris-free space missions by all Indian space actors, governmental and non-governmental, by 2030. 5
The note lists the steps: avoid debris during operations and post-mission disposal, avoid on-orbit collisions and break-ups, and avoid intentional break-ups with long-lived debris. It also asks for post-mission disposal of spent stages and satellites with a success probability of more than 99%, by controlled re-entry or de-orbiting to an orbit with less than 5 years of remaining life. 5
It adds special care for human spaceflight, treating 400 km +/- 30 km as the orbital band, plus trackability, identifiability and manoeuvrability of all satellites. Mission extensions are to be recommended only after considering system health and readiness for disposal. Implementation starts at the beginning of 2025, with IS4OM as nodal point and annual progress evaluation. 5
Practice is already visible. Cartosat-2 was the first LEO satellite ISRO de-orbited at end-of-life, cutting its post-mission orbital life from more than 30 to less than 4 years. Megha-Tropiques-1 had a controlled re-entry on 7 March 2023. In 2025, IRNSS-1D was raised to a graveyard orbit nearly 600 km above the geostationary belt. 2,3,1
On sensing, ISRO says it has established Multi Object Tracking Radar at SHAR and a few optical telescopes, and that the NETRA project is establishing a space surveillance and tracking network of radars and optical telescopes. ISRO says private industry and academia are expected to take part. 4,6
In a January 2023 talk at an ISRO workshop on SSA and STM, NASA's chief scientist for orbital debris J.-C. Liou said about 27,000 objects of 10 cm or larger are tracked, about 500,000 are 1 cm or larger, and more than 100,000,000 are 1 mm or larger. 7
He said conjunction assessment and avoidance against tracked objects of 10 cm and above address under 1% of the orbital debris mission-ending risk, which is driven by millimetre-sized debris. He also noted a lack of direct measurement data on such small debris above 600 km altitude. 7
On prevention versus cure, he cited the cost of ESA's ClearSpace-1 mission to remove a 112 kg payload adapter as 100 million euros. He said global compliance with the 25-year rule has been below 40% over the past 15 years. 7
It is an annual assessment of the prevailing space situation compiled by IS4OM and shared with stakeholders. ISSAR-2025 was released on 8 April 2026. 1,2
India aims for debris-free space missions by all Indian space actors, governmental and non-governmental, by 2030. It was declared on 16 April 2024 and implementation starts at the beginning of 2025. 5
ISRO's 2022 report says the project Network for Space Objects Tracking and Analysis (NETRA) is establishing a space surveillance and tracking network of radars and optical telescopes. 6
ISRO reports 4 CAMs for GEO satellites and 14 for LEO satellites, 18 in total, plus 2 for Chandrayaan-2. 1
How this page was made: written with AI from the sources above, read on 19 November 2026. Every figure was checked against the source it cites; lines under "Why it matters" are our view. Editorial standards.
Have a question about deeptech in India? Ask Kriyā: it answers from our dated sources, and the first answers are free.
Ask Kriyā