Many charge point operators (CPOs) and charger makers ask the same question: does India require OCPP? The short answer from the Ministry of Power's 2024 guidelines is no, not in so many words. OCPP is named and encouraged. What the guidelines do require of every charger is compliance with BIS standards and CEA safety rules. This page sets out the exact wording, what else a CPO must do, and how to pick an OCPP version when the rules do not say.
The Ministry of Power issued "Guidelines for Installation and Operation of Electric Vehicle Charging Infrastructure-2024" on 17 September 2024. They replace all earlier versions and took effect on issue. The letter is addressed to Union ministries and to the Chief Secretaries of states and Union Territories, and it applies to manufacturers, owners and operators of charging infrastructure.
The guidelines define four protocols in their glossary:
The rule for public charging stations is in the section on general requirements, under "Communication Protocols": "Open Standards are recommended." Public CPOs "may adopt" UEI, OCPP, OCPI or Open ADR for communication with distribution companies (DISCOMs) about demand response, and the protocols must comply with the cyber security provisions in force. A second clause, on the national database of charging stations, says CPOs "are advised to adopt" the same open protocols for data sharing.
So the wording is "recommended", "may adopt" and "advised". It is not "shall". A state, a DISCOM or a charging network can still ask for OCPP in its own contract or tender.
The mandatory part is about equipment. The guidelines say all electric vehicle supply equipment (EVSE) "shall comply with BIS standards" listed in Annexure I, and that safety and connectivity must follow the CEA's 2023 safety regulations and its 2013 technical standards for connecting distributed generation.
| Power level | Charger | Capacity in Annexure I |
|---|---|---|
| 1 | Light EV AC, DC and AC/DC combo (2W, 3W) | Up to 7 kW AC, up to 12 kW DC |
| 2 | Parkbay AC (3W and 4W) | 11 kW or 22 kW |
| 3 | DC charging (4W, buses, trucks) | 50 kW to 250 kW |
| 4 | DC high power (e-bus, trucks) | 250 kW to 500 kW |
Annexure II adds that each EVSE model, with its power rating and communication protocol, must be type tested by the manufacturer in line with those BIS standards, at a lab accredited by the National Accreditation Board for Testing and Calibration Laboratories (NABL), with a valid type test certificate. Annexure I also lists the vehicle-to-charger communication for each level, such as Bluetooth Low Energy, CAN and IS 15118 power-line communication. That link between car and charger is separate from OCPP, which links the charger and the back end.
Two sizing rules also apply to public stations. CPOs will preferably provide chargers of at least 7.4 kW. A station set up for fast charging of long-range and heavy-duty vehicles must have at least two chargers of at least 240 kW each.
The guidelines name no version. The Open Charge Alliance, which owns the protocol, says OCPP 1.6 was released in 2015 and remains widely used, OCPP 2.0.1 came in 2020, OCPP 2.0.1 edition 3 was approved as IEC 63584 in 2024, and OCPP 2.1 was released in 2025. It adds that OCPP 1.6 and OCPP 2.0.1 are not compatible. OCPP 2.0.1 adds device management, security and smart charging over 1.6.
Because there is no mandate, base the choice on who you must connect to. Ask the DISCOM, the state nodal agency and the networks you want to roam with which version they support. If you build a new charger or back end, supporting 2.0.1 gives you the security and smart charging features the Open Charge Alliance lists, but you may still need 1.6 for older networks. Our page on OCPP latency in EV chargers covers the performance side.
State rules and tender terms differ, so check them with a lawyer or your state nodal agency before you commit hardware.
Not under the Ministry of Power's September 2024 guidelines, which say open standards are recommended and CPOs may adopt OCPP, OCPI, UEI or Open ADR. BIS standards and CEA safety rules are the binding equipment requirements. A tender or state policy may add OCPP.
The guidelines do not say. OCPP 1.6 is widely used and OCPP 2.0.1 is the newer, IEC-approved version, and the two are not compatible. Ask your DISCOM and partner networks.
No. The guidelines call charging a de-licensed activity. You still need to meet the equipment standards and, for public stations, register on the BEE database.